Hospitals & Healthcare

Comprehensive window film solutions for hospitals and healthcare facilities addressing patient comfort, energy efficiency, UV protection for sensitive equipment, and safety compliance.

Industry Challenges

  • ✗Extreme solar heat gain increasing HVAC costs
  • ✗UV damage to sensitive medical equipment and pharmaceuticals
  • ✗Patient comfort in sun-exposed rooms
  • ✗Safety glazing compliance for patient areas
  • ✗Privacy requirements for examination rooms
  • ✗Glare on medical displays and monitors

Our Solutions

  • 3M Prestige Series for maximum heat rejection in patient wings
  • Safety film for psychiatric and pediatric areas
  • FASARA decorative film for privacy in examination rooms
  • UV-blocking film to protect pharmaceuticals and equipment
  • Anti-glare film for operating theaters and diagnostic areas

Recommended Products

3M Prestige Series

Maximum heat rejection without darkening patient rooms

View Product

3M ULTRA S800

Safety glazing for psychiatric and high-risk areas

View Product

3M FASARA

Privacy for examination and consultation rooms

View Product

Case Study

Major Riyadh Hospital Energy Retrofit

Client

500-bed hospital facility

Challenge

Annual AC costs exceeding SAR 2.5M with patient complaints about heat in south-facing rooms.

Solution

Installed 3M Prestige 60 on all south and west-facing windows (8,000 sqm). Added safety film to pediatric wing.

Result: 35% reduction in cooling costs, zero patient heat complaints, safety compliance achieved.

35%

Energy Savings

SAR 875,000

Annual Cost Reduction

2.1 years

ROI Period

8,000 sqm

Area Covered

Frequently Asked Questions

Does window film affect natural light in patient rooms?

3M Prestige Series maintains 60-70% visible light while rejecting 97% of infrared heat. Patients enjoy natural daylight without excessive heat.

Is safety film required in hospitals?

Saudi building codes require safety glazing in certain areas. Safety film is a cost-effective retrofit solution compared to replacing glass.

How long does installation take for a hospital?

A typical 500-bed hospital takes 2-3 weeks with minimal disruption. We work around patient schedules and sensitive areas.

Downloads

Healthcare Solutions Guide

brochure

Hospital Case Study PDF

case-study

Safety Film Compliance Guide

compliance

Ready for a Hospitals & Healthcare Solution?

Contact Golden Glass for a free consultation and site assessment.